I have a threshold between two areas of my house. The transition piece drops 1" and is 2.5" wide. Does anyone know or have experience with a S5 or S6 clearing this?
Not that it makes any difference, it's a very gradual transition:. https://imgur.com/a/mKQ0SHB
Hello,
I found that you emailed us and got a solution.
To ensure the robot pass the threshold, the degree should be within 10 - 15.